MANILA, Philippines — The Energy Regulatory Commission (ERC) announced that it has issued the 2025 Amended Rules Enabling the Net-Metering Program for Renewable Energy.
The regulator said this development aimed to streamline the implementation of the net-metering program and make renewable energy (RE) adoption more accessible to qualified end-users.
Following a series of public consultations and careful review of stakeholders’ inputs, the ERC issued Resolution 15, Series of 2025, introducing key amendments aimed at strengthening consumer protection and simplifying processes for availing of the program.

As per the ERC, one of the key amendments permits the banking and rollover of net-metering credits toward a qualified end-user's electricity usage across current and future billing periods., This news data comes from:http://cwf-pj-pk-ddh.xs888999.com
It added that in the event of a property ownership change, the credits may be transferred to the new owner, subject to conditions such as a conforme letter from the original owner.
ERC amends net-metering rules to expand renewable energy options
Net-metering allows customers of distribution utilities to install an on-site Renewable Energy (RE) facility not exceeding 100 kilowatts (kW) in capacity so they can generate electricity for their own use.
In turn, any electricity generated that is not consumed by the customer is automatically exported to the distribution utility's’s distribution system.
- Tensions soar in Indonesia as protests over police brutality and lawmakers' allowances continue
- 'God's Influencer' to become first millennial saint
- Rep. Tiangco reveals P17B flood control allocations linked to former appropriations chairman Rep. Zaldy Co
- Israel launches new spy satellite in 'message' to enemies
- DOJ indicts Abra Mining for fraudulent trading
- Brawner orders troops: Stop China from boarding BRP Sierra Madre at all costs
- Need a pee? Japan has QR code for that
- China races to build world’s largest solar farm
- South Africa's most vulnerable struggle to find HIV medication after US aid cuts
- COA launches sweeping audit of flood control projects